Kukusan 2
Type
Mini hydropower plant
Capacity
5.4 MW
Location
Lampung
Scope of Work
Detailed engineering design, civil construction, hydro mechanical works, weir, intake, sandtrap, flushing, waterway, headpond, penstock and powerhouse
Status
Completed

Project
Overview
The Kukusan II Project is a run-of-river power plant located in Tanggamus, Lampung. Construction began in 2022, with commercial operation slated for 2025. The plant has a production capacity of 5.4 MW and an estimated annual energy output of 35,054 MWh.
The designated discharge is 5 m³/s with a net head of 124.6 m. The plant is equipped with two horizontal Francis turbines operating 24 hours a day, ensuring a reliable and sustainable energy supply.